Step 1 of 5 · Structures

What are we pricing?

Confirm the market this job prices under and which buildings are in the quote. Everything here is already filled in from the design — change what is wrong and carry on.

1

Market

Taken from the job's address. Changing it re-prices the whole job against that market's catalogue.

Canada

2

Buildings in this quote

Included is inside the quoted price. Optional is fully priced and offered as an addition, beside the pump and tank, and stays out of the total until the customer takes it. Excluded is not quoted at all. Where several buildings are identical, draw one and set its count — × 3 charges everything in that zone three times.

2 of 3 included
Roof
Pipe 412 ftas drawn · materials list rounds up to full 12 ft lengthsHeads 18
Roof
Pipe 138 ftas drawn · materials list rounds up to full 12 ft lengthsHeads 6

Offered as an addition and currently accepted, so it is in the quoted total. Its own price stays measurable, so the customer can still see the total without it.

Roof

Not part of the design being priced — the active design has Z01 and Z02. It carries no heads, no pipe and no cost, so nothing on this quote is charged for it. Remove it, or draw this building on the Design step.